how many liters of water required for 1cu.m concrete?

3 24192

At which place Construction joint should provide in slab and Beam at the time of casting.

3 5292

what is meant by VDF FLOORING? why it is used?

2 18937




What is the unit weight of cement?

1 4977

how much quantity of binding wire required for tieing of 1mt of reinforcement bar?

5 5311

how to compute slab reinforcements on step by step procedures??

Juniper Networks,

1 3418

why steel is used in rcc columns? what is its purpose?

3 5899

can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

740




pile load testing procedure

837

acceptance criteria for concrete works

L&T,

864

Diversion of cum to cft

9 8300

what is a moisture correction

ITC Infotech, Unity Infraprojects,

2 4639

what is a coupler and where do u use it ?

ITC Infotech,

1 4006

From which end do you start deshuttering in a) cantilever portion b) simply supported portion

ITC Infotech,

2 8867

RCC MEANS

7 3783


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how is the reinforcement is distributed in triangular slab

850


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

611


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

1511


difference between fc and fc'?

511


why development length = 50D . why not 100D

558






What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

1458


how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?

1290


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

559


What is the difference between Grade I, II and III of GSB?

879


define the strength

873


How much cement,sand,bricks and water needed for 1square metre brick work?

472


what are the duties of Site Engineer in work site?

381


what is work of planning deptt. in any construction compny (in road project)

1072


what is total volume of ingredients used in concrete accordingly

995


If specific gravity of cement is less than 3.15 what is the cause?

841