Civil Engineering Interview Questions
Questions Answers Views Company eMail

Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com

2 2695

among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????

3 9530

Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

824




what is the diffrence between Specific gravity & Density??

3 4325

What is cementation

1 2874

The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 1787

hi... how to find reaction in continous beam 4 different span ?

1 2418

if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

744




is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

713

10mm Rebar total 12meters length how to calculate ?

4 6719

which red: used in roof teping, then use only cement

799

How many different between estimated quantity and practical work at site.

1 2423

what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?

1 1278

how many square meter plastering get from 1 cubic meter cement mortar for a thickness of 12mm

Home,

3 15861

How do you find the difference between 53&43 grade cement in site?

L&T,

6 7147


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

punj loyed and sapurjl palanjl

1072


Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

468


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

27078


1m square 20mm plastering how much of water need curing work

631


how is the reinforcement is distributed in triangular slab

887






I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs

1187


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

582


How to calculate quanty of steel in four leg stirrups?

629


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

3940


what is the permanent solution applied for restoration of leaning tower of pisa?

2180


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

806


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

917


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

725


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

1199


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

599