Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id:

2 2504

among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????

3 9201

Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.


what is the diffrence between Specific gravity & Density??

3 4094

What is cementation

1 2706

The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 1638

hi... how to find reaction in continous beam 4 different span ?

1 2269

if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.


10mm Rebar total 12meters length how to calculate ?

4 6367

which red: used in roof teping, then use only cement


How many different between estimated quantity and practical work at site.

1 2291

what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?

1 1132

how many square meter plastering get from 1 cubic meter cement mortar for a thickness of 12mm

3 13384

How do you find the difference between 53&43 grade cement in site?


6 6788

Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

what is w/c ratio in dry lean concrete for m10 mix design


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.


What expenses counted in contingencies and how much it is in related to built-up area of the building.


Please tell me vasthu room sizes. Thanks.


what is tension & compression of steel bending.


How to calculate sand , cement quantity for 23mm thk brick work(10x10)


plz drive the formula d2/162.162 for the calculation of weight of steel bars????


what is raft foundation


How to calculate the load of partion in flat slab if we use brick?


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).


how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.


how to clculate the %of concrete strenght achive after curing?load


what is difference between fluidity and workability also how palsticizer works


how many time use of plywood shuttering and IS code


why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.