what is the criteria for the finalisation of pavement thickness in road project?

866

NP3 CLASS HUME RCC PIPE

1 2287

how to convert m 25 concrete to m 40?

3 5187




what is the difference in density of fresh concrete and hardened concrete?

GPSC Gujarat Public Service Commission,

1 4706

The corrosion resistance of a material is.

4 3109

What is the cemnent ratio

DPR,

1104

57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

L&T,

7457

Diagonal check is required for a layout work to confirm ––

3 4671




Management diagram of your project is–––

1 2425

What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?

L&T, Alstom, ABC Enterprise, IOCL, MICCO, PDC Construction, Badri Rai, NKC,

8 67146

For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate

2 6830

what is the meaning or full form of 12T13 cables used in prestressed bridges

3399

how many rods to be require in kg 10sq.m slab?

L&T, RRB,

6 7379

what is the criteria for the finalisation of pavement thickness in road project?

1 2348

extra how much quantity need to fill the actual excavated quantity.

L&T, Mechanical,

4 5329


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

1042


If specific gravity of cement is less than 3.15 what is the cause?

940


how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?

4733


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

1581


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1136






The 4 main factors to start a construction project are––

986


from where ican get sample papers for CET-delhi 2012

1189


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

1106


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

1530


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

580


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

4737


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

876


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

468


What is M40 _ TOR - EQ and B.F.S

1229


what is the coefficient for running feet to cft coversion both area and price

1130