advantage and dis adventagesof using crusher dust insted of sand in rcc works

Descon, DLF,

3 4862

What is the size of your cube mould

Inforce,

6 4679

how to calculate reinforcment in staircase cranked beam?

DLF,

1133




Which IS Code/American Code applied for coupler test of steel

Bestech,

1208

what is diff between auto level and dumpy level?

ABB, L&T, NCCL,

4 58971

whats the difference between young's modulus,stress and pressure.they have same unit

3 5462

What kind of tests will conduct in plastering

6 6108

Kindly tell me a book name to study for BIS exam

BIS, NAB,

1 2782




why we use cement for concrete

7 5802

in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity

L&T,

5 9407

HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM

CCCL, L&T,

1 7421

advantages & disadvantages of using crusher dust instead of sand in r.c.c work

L&T, Shm Consultants,

3 20149

test procedure of fly ash bricks as per code

L&T,

2 10865

what IS Code used for TOR & TMT steel bar

L&T, Lokhandwala Construction,

6 18705

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.

L&T, JTP,

9 22209


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how many litres of enamel paint required for 5000 sft of site?? 

569


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

875


what is that one cub metre plaster in cemant and fine sand

621


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

1499


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

858






What are the disadvantages while using stone dust as filler in pavements?

1013


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

744


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

1258


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

9794


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

798


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

878


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

1009


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

369


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

107


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

722