Tell me about Construction, Contraction and Expansion joints...

Modi Builders, SMCC,

2 4638

Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

HCC,

1516

Structural steel: For a thumb rule check in field, the allowable weight which can be hung down for 10mm dia mild steel rod, of yield value of 0, 25 KN/mm2 and applying a factor of safety 2.00, will be how many kg?

3 6818




Soil Mechanic: You are building a gravel road. How much water do you need to mix in compact 100 m3 of road quantity borrow pit gravel?

1 4091

Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

1883

Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

1 4703

What is cold joint, what will happen due to cold joint?

1 3490

how much lenth of a bar increase when it bends at 90 degree.

5 11330




What is the DENSITY of 20mm Course aggregate?

3 9104

How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.

2 5217

what is the ratio of cement water and sand in RCC?

GMR, DLF, Cimplex,

7 19467

whaat is the difference between opc and ppc

3 4926

what is the difference between compaction and consolidation?

4 5530

what is mix design in mortar mix?

2 3684

how much dry volume of cement in 1cum in m20 grade

3 4243


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

what is penetration test?why it is done?

943


How is calculate the cube molt

752


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

246


how to clculate the %of concrete strenght achive after curing?load

946


What is the difference between Grade I, II and III of GSB?

895






If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

516


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

986


How to design staircase.plz tell me formula for the design the staircase.

611


what discoveries did you have in relation to your course?

884


will fix foundation bolts at site with out template is there any procedure?

1336


What is the Null Point of chimney in Power Plant

2391


how can we calculate steel value, depending on load

896


what is the maximum number of course that can be laid according to IS code and the max height.

753


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

767


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

872