What is the per square fee cost of external development of a multistorey group housing project
1 3605Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
2349Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
2464Post New Civil Engineering Questions
Explain soil analysis?
What are the main reasons for conducting pull-out tests for soil nails?
Did any of the egyptian pyramids ever fall down?
how do we design mix ratio?
how to tie 10 legged stirrups
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What is a bearing capacity of soil?
how calucate cement sand ratio for plstering
What are the different approaches in designing the floors of the service reservoirs?
Which IS Code/American Code applied for coupler test of steel
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Why should you show Client/Engineer activities clearly on the project plan?
Describe the sections included in a typical bill of quantities
what is the types of door's wood?