What is the the sequence/logic of burner management system in boilers. What is purging and scavenging?
2 4281What vibration parameters are monitored in a directly coupled single cylinder turbine and generator?
1 2187Our 8mw steam turbine (condensing cum extraction) exhaust steam temperature is high even after taken it in hogger why
1 3766Why we need to maintain furnace and secondary air dp.if it increase or decrease what happens.
1 9936our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
SWR,
1644Post New Power Plant Engineering Questions
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
why do you consider yourself a suitable candidate for this position
what is the trip circuit supervision in an electrical meaning?
How do you consider that you can improve and what assistance do you need to achieve this
why airtel use + 24 volts and other operators use -48 volt
what is the meaning of SST300 V56A in SIEMENS turbine
can dp type level transmitter work in under vaccum condition
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
what does mean by kva rating
LAPT working in alternator / generator
By any way can we increase the B check hours from 300 to 500
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is restricted earth fault explain in details