why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?
3 4043What is wheel chamber in steam turbine?is it impulse blades are called wheel chamber in the steam turbine?
1 7975what is the formula for converting mmwc to tph in a dp type transmitter.what is the range in plc(in tph) if dp tx.range from 0 to 5000mmwc.
CCC, Korba Power Plant, Shyam Steel, Utkal Alumina International,
2 22281Post New Power Plant Engineering Questions
Why superheated are started before I'd and rd fan?
operation
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is the trip circuit supervision in an electrical meaning?
What is LB-SR.
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is the meaning of SST300 V56A in SIEMENS turbine
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
what does mean by kva rating
By any way can we increase the B check hours from 300 to 500
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How We Calibrate the vaccum transmitter?