If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
IBM,
2 5308What is the configuration done for Order type dependent parameter and confirmation parameter
IBM,
2 8918Tell me important of the Production scheduling profile what are the things have to maintain in this profile
IBM,
2 9496Post New SAP PP (Production Planning) Questions
What is phantom item & sub contracting
What are the t-codes for creating, changing and summarizing bom?
What is end user training
what are the constraints of Variant configuration?
Explain source inspection.
Consignment matl how will be use
What is the t-code for changing production order and to display production order?
What are all the steps involved in Variant Configuration?
What is 'capacity planning'?
Difference between PP and PI.
• How are basic order dates determined?
What are the reports generated in product cost controlling information system?
What are sequence, parallel, overlapping, splitting and where can we assign these
What are the types of master views for production and planning?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?