Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



IBM MainFrame Interview Questions
Questions Answers Views Company eMail

Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.

TCS,

3 12274

Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.

TCS,

4 8697

A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X

TCS,

3 7024

Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand

TCS,

4 7599

Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all

TCS,

5 8400

The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290

TCS,

4 8532

How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.

IBM, TCS,

16 25438

What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.

Mphasis, TCS,

6 13474

What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES

TCS,

7 10212

88 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above

TCS,

5 10851

ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete

TCS,

4 9136

COMPUTE X = A * B - C * D and COMPUTE X = (A * B) - (C * D) (a) Are not the same (b) Are same (c) Syntactically wrong (d) Will yield a run time error

TCS,

1 6450

OCCURS clause is used in the DATA DIVISION on data names at (a) 01 level (b) 77 level (c) 88 level (d) any level from 02 to 49

TCS,

13 20726

Consider the following COBOL entries: 05 X PIC 99 VALUE 10. SUBTRACT 20 FROM X. The resultant value of X wil be

TCS,

7 15587

Consider the following COBOL entries 05 X PIC 99 VALUE 10. ADD 40 X TO X. COMPUTE X = 3 * X - 40. The result in X is

TCS,

12 19302


Un-Answered Questions { IBM MainFrame }

Which statement is used to identify the private libraries in job?

1185


In sms datasets, what is the function of the dd avgrec keyword?

1090


How can the submitting users racf authority be overridden in a job stream?

1263


Explain the function of data manager.

1044


What is journal recovery?

1044


how do you create a dataset in a jcl with the same file organisation as that of another existing dataset?

1399


define clustering index.

1023


Can the values of alphanumeric be moved to variable numeric?

1090


What is deadlock in db2?

1062


What are the different open modes available in cobol?

1187


Have you caused any huge mistakes for the bank?

928


How do we pass parameters into a CICS –DB2 program

4154


Explain about base register?

1055


How to alter the parameters for the existing gdg?

1198


what is a corelated subquerry?

1121