Programming Languages (22694)
Scripts (9280)
Networking (2571)
Microsoft Related (21566)
Databases (16615)
Operating Systems (12022)
Testing (17995)
Servers (1375)
MainFrame (6620)
Java Related (15396)
Middleware (526)
Web Related (7038)
Data Warehouse (8975)
HR Questions (2698)
Software Design (1923)
Debugging (73)
Version Control (464)
Editors (229)
Telecom (1164)
ERP CRM (26424)
Embedded Systems (1221)
Client Server (333)
Artificial Intelligence (3276)
Cryptography (718)
EAI (466)
Multimedia (674)
Software Development Life Cycle (303)
Image Processing (170)
Mobile OS (3116)
Security (125)
Big Data (4325)
Cloud Computing (1790)
Automation (2674)
Internet of Things (IoT) (299)
Apache Related (370)
Frameworks Tools (1329)
Oracle Related (0)
Tell about the mistake you learned from
Can constructor have return type c#?
What is a extract is tableau?
What is base band frequency hopping in gsm technology?
How many html5 tags are there?
Define dimensions?
what is the undefined bits in flag registers of 8085 microprocessor?
what is the difference between Windows application and Unix application?
how to align objects to the slide?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Tell me the use of set control field in record field properties?
Which is more beneficial: CMP or BMP?
What is word-break property used in css3?
What is logging (logcat)?
What design patterns have you used? In action script and java?