Answer / garima mishra
e=k/d
combined force=inividual force
let k=1 constant
1/6=1/24+1/16+1/x
1/x=1/24+1/16+1/6
1/x=16/96
1/x=1/6
so, x=6.
| Is This Answer Correct ? | 8 Yes | 47 No |
what is difference between candidate key and alternate key
sir, please send me the last three years exam papers conducted by CPCL- RECRUITMENT EXAM FOR Recruitment of Engineer ELECTRICAL ENGINEERING. A Soon as possible. i would be greatfull to u
synchronous and asynchronous transmission
wats the difference between RS latch using NAND n NOR gate? which is to be preffered?
/bin/bash is missing.
please provide me the type of questions or question pattern of bally.
How to control the Relative humidity in Air handling unit in Pharmaceutical company ,the AHU is comprised with DX system(Cooling coil) and dry heaters. We are facing the RH issue low side and higher side.
0 Answers Archimedis Healthcare,
what is the difference between physical address and logical address?
explain different access specifiers in class
(53/3)r=(15)r ,find the value of r?
is overloading and overriding are static or a run time binding?
what is your career objective?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)