Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to checking sld drawingas and control drawings



How to checking sld drawingas and control drawings..

Answer / mds khan

Slds represent 3 phase drgs, so everything will be tripled
and compared while control are traced as it is.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

can indirect loading be called as phantom loading?

0 Answers  


How to test Power Transfomer vector group?

1 Answers   Bhel,


In Induction machines which type of emf is induced ( statically or dynamically)?

1 Answers  


WHAT IS METHOD TO DESIGN SIZE OF A 11KV UNDER GROUND CABLE FOR A OUTGOING FEEDER FEEDING 6NOS 250KVA TRANSFORMERS WITH 5KM LENGTH OF FEEDER?

1 Answers  


what is high tension ? specify the range?

3 Answers  


why capacitor is not discharged phase to body

1 Answers  


Where burned of electricity,when,who, & why.

0 Answers   NIGP,


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

0 Answers  


A 230 v dc series motor is connected to 230 V ac supply, then

1 Answers  


what is advantage of using star to delta in place of dol starter

4 Answers  


what is power factor? how can we correction the power factor if this is high or low? If anyone know please please send the answer on my email id ( kumarkirshan@in.com )

5 Answers  


A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)