21. Are you able to work under pressure?
Answer / khusbu123
according to me the following answer is appropriate.
the efficiency increases under pressure .
for example we complete the whole syllabus under the pressure of exams b fore 1 night which we are not able to complete in 3 months.
"IF SOMETHING IS AT STOCK THE HUMAN MIND GETS IGNITED AND WORKING CAPACITY GETS ENHANCED"( SHIV KHERA )
| Is This Answer Correct ? | 9 Yes | 1 No |
std ht of wallmixer from ffl
How Mney Layers in 8mm plywood
During reclamation how can the occurrence of mud waves can be rectified?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
how much required strength of cement concrete bricks(size 230x115x75mm)
How do you calculate the unit weight of concrete?
What are the advantages and disadvantages of lead products in construction?
What is the force exerted by the tacoma narrows bridge?
How can i find number of brichs required for given quantity of wall in m^3..
5 Answers vasanth construction,
How to calculate soil bearing capacity of soil?
how to calculate water cement ratio?
6 Answers IVRCL, Saroj Group, Sobha Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)