21. Are you able to work under pressure?
Answer / khusbu123
according to me the following answer is appropriate.
the efficiency increases under pressure .
for example we complete the whole syllabus under the pressure of exams b fore 1 night which we are not able to complete in 3 months.
"IF SOMETHING IS AT STOCK THE HUMAN MIND GETS IGNITED AND WORKING CAPACITY GETS ENHANCED"( SHIV KHERA )
Is This Answer Correct ? | 9 Yes | 1 No |
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How to find CN by using arcgis 9.3?
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
in railway engineering, what are the types of guages? what is its size,length & thickness?
how much steel required for 1 sq.m area?
how calculate the ms beam weight?Please give me formula details?
How much percentage of silt contain maximum allowed?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is the procedure of steel?pleas tell me how we can apply in any home or building?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
In built up area basis what is ratio of concrete