why is the scheduling decision needs to be taken when a
process switches from running to waiting state.also,if this
is because the next process is to be allocated to cpu then
why not a scheduling decision taken when a process switches
from ready to running state.
No Answer is Posted For this Question
Be the First to Post Answer
tell me the e book for data structure (basic)
how bluetooth works?what is principle behind in it?
dam,rivers,states capt,
If there's any possiblity for the Enginnerring graduates, Who had backlogs in there acedmic to get a Good MNC job?
Create an midp application which examines that a phone number which has enters is in the given format * Area code should be one of the following:040,041,050,0400,044
What is the importance of object oriented modeling in various approaches used in engineering
how you judge that your interview go good????
send me e-mail on dell tech question papers 2011 -2012
WHAT IS THE PROPER LOCATION OF SAMPLE POINT OF LPG SPHERE TANK?
i need to know abt renault nissan company and the rounds and type of questions asked by today
What are the main differences between Exchange 5.5 and Exchange 2000/2003?
i want to knw about what is lead,survey, oppertuinty , questionary,sales order,quotation,marketng conecpts in deatil and how it works in SAP CRM. Please send to my email- id as soon as possible. Thanks in Advance . :) nimi.nimisha1@gmail.com
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)