what are the documents(Construction point of view for a
process plant) submitted by contactor initially entering in
to new site for client?
No Answer is Posted For this Question
Be the First to Post Answer
Why using negative voltage in vibration measurement?
As an industrial instrument technician what we have to know?
what is sinking and sourcing....
Why any transmitter signal is 4-20 mA only Why is started from lower range 4 mA and upper range is 20mA.
What are the error values can accepted in flow transmitter calibration?could u give any formula for this?
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
What is mean by Adapter block and net block?
Why Bently Nevada use negative voltage for vibration probes?
i am going to attend ongc exam this coming june for Graduate Engineer Trainee post if anybody knows the question pattern or have experience plz share it with me
How a rtd work, and what volts/current goes to a RTD to measure the resistence?
How can you add value to this Industry if offered the job?
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)