Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How we find the size of cable if we know the current

Answers were Sorted based on User's Feedback



How we find the size of cable if we know the current..

Answer / aju

We can choose the cable according to the current rating
after considering overload and voltage drop factors

Usually cables are loaded upto 75-80 % of the rating
specified by manufacturer ..

For instance, if you need to choose a cable for a current
rating of 25 A, we can simply choose 6 sq.mm cable since it
can carry 35 Amps. It is desirable not to use 4 sq.mm cable
which has a current rating of 28 A since it has no
sufficient spare capacity for overload condition.

Again, the cable size also depends upon the voltage drop
which depends upon the length of the cable....

usually voltage drop must be within 3-5 % range.If it
exceeds this limit then next higher size must be used until
it satisfies the 3% range


Eg. for calculation of voltage drop in 25A, 240V single
phase feeder having 150M length

Voltage drop/Ampere/Metre for 35 Sq.mm cable=2.1mV

Voltage drop= (2.1x25x150)/1000 =7.88V

% Voltage drop= (7.88x100)/240 = 3028%

Since it exceeds the 3% range, take next cable size

Voltage drop of 50Sq.mm cable= (1.6x25x150)/1000 =6V

% Voltage drop =(6x100)/240 =2.5%


Hence, we can select 50Sq.mm cable

Is This Answer Correct ?    74 Yes 15 No

How we find the size of cable if we know the current..

Answer / reddy

cable size can be selected like ,suppose if u have any
motor with u of 110kw and its full load current is 190 then
when it is in dol stater starting torque is high up to 2
times of that full load so we have to use 300sq mm.if it is
in star delta 240 sq mm is enough because in a star
starting current is low it means 70 to 60 percent of full
load .after that some time delay delta pick ups

Is This Answer Correct ?    40 Yes 21 No

Post New Answer

More Electrical Engineering Interview Questions

after how many spot we must chang secondry cable in portable spot welding gun?

0 Answers  


Define what is the function of anti-pumping in circuit breaker?

0 Answers  


Alternator couple to diesel engine why, Alternator couple to ac service motor with gear drive for 1500 rpm possible (yes or no) aim to low input power supply give to motor then high output power taken for alternator Please answer this question

1 Answers   Turbo,


acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO

0 Answers  


In Round type three phase transformer why the LV side is inner part and HV outer part in the design of transformer? why they cant be opposite?

2 Answers  


why neutral and earth should not be connected on 3 phase 440v/50c/s supply at consumer side. where as on 25kv/ac/50c/s railway traction substation neutral and earth will be connected and track at substation. and track will act as neutral and earth. Reasons for this is needed urgently

4 Answers  


What is the main feature of v/f control?

1 Answers  


what is multiplying factor of a energy meter connected with a CT ratio of 600/5 and voltage at 415 volts.

1 Answers  


Is there any design in the world a 220 KV transformer without breather …??????

2 Answers  


what is the d/f b/w iverter & converter.

5 Answers   Indeco,


I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

0 Answers   HCL, TCS,


What meant by lagging and leading? When if they are occurred what preventive methods should be taken?

14 Answers   ABB, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)