Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


pls, send me jindal steels & power aptitude ques


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Mechanical Engineering Interview Questions

sir iam vinod kumar i have done B.TECH. in mechanical engg in 2007 i want to choose career as section engg.please give the information about coaching institute.

0 Answers  


what is the difference between bolt tensioning & bolt torquing give in detail ??

2 Answers  


How do you design a system which is required to experience a shock force of 15G in 10 milliseconds?

0 Answers  


why do we require cooling towers in case of water cooled chillers?????

2 Answers  


if it is possible for the air conditioner to maintain the temperature of 20 degree Celsius when the atmospheric temperature is 10 degree celsius

4 Answers  


what is the effect of clearance volume in performance of air- compressor???

5 Answers   Boeing, Godrej, L&T,


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

0 Answers   Saudi Ceramics,


sir i am working in CIM Technologies , AS DESIGN ENGINEER, I WANT TO PREPARER FOR INTERVIEW TO THE DESIGN PLEASE SUGGEST HOW TO PREPARE FOR INTERVIEW

0 Answers   HAL,


how material removal occurs only in workpiece not in tool during an EDM process?

0 Answers   Anna University,


What is the maximum use of magnesium ?

0 Answers  


What are the different types of pumps? and their usage.

0 Answers   John Deere,


Heavy fuel oil sulfur content and counter measures?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)