I was once rejected for US visa in early August. But now
I'm going again for interview next week. What are the
chances that I will faced the same VO????
No Answer is Posted For this Question
Be the First to Post Answer
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
May I Get an E-mail ID or contact details of Mr. C.M.Dordi Vice President - Technical Sales Ambuja Cements Limited. Please
how to find fineness modulus of sand?
what in total station list counting
how much extra rod length should be provided for beam
What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.
brick size-230x110x75, how many no of bricks cover 1cubic meter.
what is diffreant between the english bond&flamish bond
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
what are the minimum compressive strength required for the concrete cube for different grades & different days .Please give me an answer.
Design a rectangular channel.
0 Answers CSI, Engineers India Limited,
FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN WHERE RUN OFF WILL BE HIGHEST?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)