can u plz send me ntpc placement papers(civil engineering)
at munjalricha1988@gmail.com and which types of questions
are aked by ntpc
Answers were Sorted based on User's Feedback
Answer / imtiaz
I too need it...if u find it then also send it to me at
imtiaz289@gmail.com
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / mukarram
I too need it...if u find it then also send it to me at
smh.qseng@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / lokesh mishra
I too need it...if u find it then also send it to me at
lkshmishra@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ziya
I too need it...if u find it then also send it to me at ziyacivil88@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sachin sharma
I too need it...if u find it then also send it to me at sharmaachin76@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / srv321
I too need it...if u find it then also send it to me at
srv321@gmail.com/saurav.saha@tcs.com
Is This Answer Correct ? | 4 Yes | 5 No |
Answer / drisya
I too need it...if u find it then also send it to me at
drisya19@gmail.com
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / bikram
I too need it...if u find it then also send it to me at
bikram2010@gmail.com
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / vinod
I too need it...if u find it then also send it to me at
vinodkumarsaini77@gmail.com
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / kingsly
I too need it...if u find it then also send it to me at kingslyjayanthan@gmail.com
Is This Answer Correct ? | 0 Yes | 2 No |
21. Are you able to work under pressure?
What is the difference between single reinforcement
what is the weight of 6000 psi concrete in lb/cft?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
what does gabion mattress means in stone pitching works
How many bag of cement used in all type of RCC
what is drainage system?
bar bending schedule?
Why silt content not allowed more than 6% for Sand ?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench