What was asked in isro civil interview
No Answer is Posted For this Question
Be the First to Post Answer
How can we convert weight batch to volume batch for m30 mix
what is mixed design, define it? what is way beecher?
What is the difference between shuttering
how much cost of single coat 20mm thick plastering per sqre meter
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
What is the percentage of wastage in steel reinforcement n how to control it?
why spacer in reinforcement?
how you calculate the data (all parameter) after transient response method i.e.pile intigrity test on pile.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
rate analysis,what is PERT, TMT ,UPVC
what is the types of surveying?which type of survey carrying for type of work?