Explain why their is need of production version ?
No Answer is Posted For this Question
Be the First to Post Answer
Explain Flexible Planning procedure or How many levels of Flexible planning.
what are all the different manufacturing scenarios in pp?
Tell some sop
Standard mrp steps
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What is processing class, where we do them and why?
One component 2 times assign to bom
Difference between MD01, MD02 and MD03.
In cost controlling information system mention the fields that are listed in the list screen of the report?
What are gaps? Some examples?
Do you want to use one BOM to represent several similar materials (closed variant BOM)?
Both labor and machine categories exist. How would you calculate the process time?