How can you create production order without routing and BoM?
No Answer is Posted For this Question
Be the First to Post Answer
In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
Define mrp list
If MRP type PD/ND in material master how will work flow.?
What is Inspection Points?
what are the constraints of Variant configuration?
I have created an order type “ZYC6”, how I know that which types of order it is like process, production or SD order?
Can't one material be assigned to more than one operation in a routing, why?
What is MRP procedure
How many levels of Flexible Planning are there?
What do we do in realization phase?
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
Difference between MTO & MTS
1 Answers Cognizant, UT Pumps,