How to calculate material and labor required for 100 m2 plaster?
No Answer is Posted For this Question
Be the First to Post Answer
Explain what is alternate bid?
why you have choosen civil engineering as a carrier ,what goals do u have and how you wil aschiene it?
Why we use pcc in foundation?
List out some of the common problems that architect have to tackle it?
how many rods to be require in kg 10sq.m slab?
How can we make a hole in a solid rectangle using solidsworks?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?
Pl answer. when we deduct 2d for cutting length of 90deg bend, whats the method of booking measurements as per IS code? whether cutting Length to be booked or something else?
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
5 Answers Nagarjuna Construction,
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
How long does it take concrete to harden?