How many square meter can a worker/labor demolish a structure per day?
No Answer is Posted For this Question
Be the First to Post Answer
What is the Maximum & Minimum size of rod using on the column?
please i wont to know the full meaning of P V C
Building construction
what is the load acting on the sides of the water tank
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what is procedure to find the volume of material in M20 concrete?
fluid flow takes place due to its:- viscosity,comprssibility,surface tension,deformation undershear force
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
what is the standard gradient or slope for drainage?
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
what is the maximum number of course that can be laid according to IS code and the max height.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)