Need advice for steel in kg for RCC Slab qty 35.64m3 and Beam/ column qty 35.39m3
Answer / yash
for rcc slab( 35.64m3) = 2.8 tonne
for beam (35.39 m3) = 5.6 tonne
for column = 6.9 tonne
not exact quantity . it is in lump sump
Is This Answer Correct ? | 0 Yes | 0 No |
how many nos of National highway in India.
13 Answers HBC, L&T,
how to calculate the steel for rcc slab 1100 Square feet
how can calculate qty of steel required for one or two ways slabs..
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
Why steel rods are produced only in even dimensions?
WHAT YOU MEAN BY PROOF STRESS?
what is meant by structural design?
what is the service corridor?
one cubic meter of concrete contains how much proportions of cement,sand and course aggregate
6 Answers AB Inc, APPSC, Arif Builders, Ramky, SMEC,
how many kg sand is requried for plastring in 100 sqft?
hi frnds i hav got thro BHEL written exam..wat to prepare for intervw..guide me plz!!!!!!!!!!!!!