What is the breaking capacity of transformer and how can we calculate the breaking capacity of tranformer
No Answer is Posted For this Question
Be the First to Post Answer
In Aeroplane what circuitry or method use for earthing?
9 Answers Bhel, EDA, Wind World,
how to select the double earth conductor if 21A full load?
Explain M Var? Which types of problem occurs when reactive power increase at the time of full load of plant and at the time of synchronize of plant?
415v 14kw so can u tell me how i can measure the cable size.then size of the earth also
what is the Earth Voltages in Power Plants, Sub-stations, Industries, Residential & Commercial Buildings.
In A.C systems, fuse is placed in phase-in order to disconnect the circuit during faulty condition. But, what is the reason for putting "LINK" in neutral istead of connecting through (same) wire.
I need tnpsc AE Electrical question papers
2 Answers TNPSC Tamil Nadu Public Service Commission,
how to find the voltage's of a transmission line plzz help with pictures i am not able to understand
How much amperes needed for starting of 4HP motor?
How Can you do Maintenance of ACB of 2000Amperes
Which of the following are ill suited for energy efficient motors application?
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)