I want to ask a question which i faced during testing of Capacitive Voltage Transformer in AIS. We have measured the C1 , C2 individually , but when we start to measure the total C1+C2 , the testing equipment shuts down and says low loading. Kindly is it possible to find the total capacitance by using measuring device. kindly briefly explain the procedure.
No Answer is Posted For this Question
Be the First to Post Answer
What are the rating wise protections required for Generators from 600KVA to 2000KVA
why there is a humming noise in transformer
name 3 measuring instrument used in transformers
What is a difference between indoor transformer and outdoor transformer of same rating
what you mean by vector group of a 3 ph transformer
1.ZEBRA conductor(large size) 2.KUNDHA conductor( small size ) 3.panther conductor(very small ) 4.lepard conductor (very very small)
difference between crane drive and line drive.
auto reclosing scheme for radial ehv feeder is to be implemented or not?
what are the pecularity of shaver sockets ?
Efficient electrical earthing in hard rock area
how to do CT Burden test
What is tranformer differtial?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)