I want to ask a question which i faced during testing of Capacitive Voltage Transformer in AIS. We have measured the C1 , C2 individually , but when we start to measure the total C1+C2 , the testing equipment shuts down and says low loading. Kindly is it possible to find the total capacitance by using measuring device. kindly briefly explain the procedure.
No Answer is Posted For this Question
Be the First to Post Answer
What are the types of control system?
why servomotor motor? where i apply for best output?
What is a DC series motor?
what is mean by current? and voltage?
I have AC automatic voltage regulator 15KVA What output currant?
CAn any one can tell me what is the operation of ceiling fan and how it will start
draw the restricted earth fault protection circuit install on power transformer and identify its parameters and draw C/C curve of it
what is the ambient temperature of transformer oil & winding?
How to calculate Temp from Resister from PT100 equation,
Explain the laying procedure and laying depth of submarine cables under sea?
what is polarity in ac system? and how do identified?
IF 3 NOS.OF HEATERS,3KW CAPACITY EACH,1 NO.HEATER CONNECTED IN R PHASE,1 IN Y PHASE AND 1 IN B PHASE.THEIR END POINTS CONNECTED IN STAR.IF I CONNECT THIS STAR POINT TO NEUTRAL OR DO NOT CONNECT TO NEUTRAL.WHAT WILL THE DIFFERENCE.