How to find the requirement of cement and sand for the 1cum of rr masonry work
Answer / s k majumder
First one have to choice grade of Concrete. Say M15 grade for which proportion is 1 : 2:4. total 7
N Now dry volume will be of 1 cum concrete is 1*1.52=1.52 cum
Hence
cement= 1.52/7 = 0.217cum = 7.66cft = 6.12 bag say 6 bag
sand (1,52/7)*2 = 0.434 cum= =15.33cft
Aggregate(=1.52/7)*4 =0.868cum= =30.66cft
Is This Answer Correct ? | 1 Yes | 1 No |
what is the diff between sudden loading and impact loading?
Why is loose concrete removed from the surface where new concrete is to be done?
what is thumb rule exactly?
how to shuttering is used in slab
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
specifications of fe500 steel
How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
hello; sir. i would like to be an assistant executive engineer in irrigation department. is it really necessary to take coaching? or can i prepare myself by studying any study materials available in market? if so; what are the books i have to purchase. please reply soon.
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
Niti Aayog has recently chalked up an action to help India achieving _____ medals in 2024 summer Olympics after dismal performance in 2016 Rio Olympics? A)20 B)30 C) 40 D)50
A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
how much cft in 1 bag cement.
9 Answers Pinto Construction, Synergy,