why steel stirrups in column have more spacing at center and less spacing at both ends??

Answers were Sorted based on User's Feedback



why steel stirrups in column have more spacing at center and less spacing at both ends??..

Answer / shalenderkumar

due to shear force.

Is This Answer Correct ?    6 Yes 0 No

why steel stirrups in column have more spacing at center and less spacing at both ends??..

Answer / thakur

Because of shear force

Is This Answer Correct ?    6 Yes 0 No

why steel stirrups in column have more spacing at center and less spacing at both ends??..

Answer / venkat

Max shear force act near the ends then max shear rainforcement privide at the ends

Is This Answer Correct ?    5 Yes 0 No

why steel stirrups in column have more spacing at center and less spacing at both ends??..

Answer / venkat

Due to bulging occures at midle portion of the column then for rectify that more stirrups are provide at midle portion of column

Is This Answer Correct ?    1 Yes 3 No

why steel stirrups in column have more spacing at center and less spacing at both ends??..

Answer / krishan murari

When ly/lx less than 2 than the slab will be two way slab vice versa..

ly/lx>2 one way slab &
ly/lx<2 twoway slab.

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

0 Answers  


How to calculate cement qty of M10, m20, m25 ? I got the formula but I lost it.

3 Answers  


what is the difference between NP2 Class and NP3 Class RCC Hume pipes

8 Answers   GWRDC, IVRCL, IVRL,


how to calculate steel columns beams and slab please give me brief calculation

14 Answers   Focus, Haven Foundation, Indian Railways, Surya Builders, VICC,


Advantages and Disadvantages of using fly ash bricks over clay bricks?

11 Answers   Pradhi Engineering,






What are the types of slump?

0 Answers  


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


what is normally consolidated clay and over consolidated clay?

1 Answers  


How much steel required in 900 square feet slab?

17 Answers   RCC, Sai Steel Corporation, TATA,


What is the minimum size of the particles of silt soil?

0 Answers  


can i get civil engineering test papers.......?????

0 Answers   IBPS, IOCL,


What is the Density of Steel & Conccrete

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)