How to create plant?
Answers were Sorted based on User's Feedback
Answer / tiruupathi rao
SPRO→IMG→ENTERPRISE STRUCTURE →DEFINITION→LOGISTICS GENERAL →DEFINE, COPY, DELETE, CHECK, PLANT.
Is This Answer Correct ? | 26 Yes | 1 No |
We have deleted a group key in an operation in routing and the same does not appear for this routing (CA02). But we noticed that entries are maintained in table PLPO and the deletion indicator is not set. How does the system remember this deletion of group key?
What are the lot size you have used?
Tell bom header level & component level
Which are the master data relevant for PP module?
what is the difference between backward scheduling and forward scheduling ?
What is mrp controller means?
What is special procurement & tell one special procurement briefly
What is milestone confirmation ?
what do you mean by planning time horizon
what are Standard keys
what are the problems you faced in MRP?
What is the SPRO Path for requirement class and req. type?