What are traffic lights in mrp?
No Answer is Posted For this Question
Be the First to Post Answer
Which BOM item category you have used?
Product Costing Run is over. Now If I add one more rawmaterial for that material also it has to included & run the cost. But it is not happening?
One work center can assign 2 cost center and one cost can assign to different work center.
What is REM or What is REM profile
What is batch management
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
What are all the ‘technical types of bom’?
What parameters you maintain in “plant parameters” in configuration?
what do you mean by planning time fence
Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?
What is the production process in sap?