In SAP PP,how do you have relation with end users?
Answers were Sorted based on User's Feedback
Answer / sap marathi manus
in short,
allways keep the following points in the mind
-u r just the system creater& end user is the owner of the
system so he should clearly understand the system which u
implement
-be confident,always keep eye to eye contact with the client
-before the presentation,study all types of expected
questions from the end user and client
-speak specific and on the point
-if any config.is not possible tell client frankly
....and lot of things...frist u start the swimming:-)
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / jinchandramule
hi all,
Sap End user is nothing but the customer,
Try to understand his basic requirements,
Know the exact production pocess on which he is working,
Map those processes in simpler way and give him the
confidence and hands on experience with SAP System.
Tell him the importance of the system and how his work will
be reduced after implementing the SAP-PP Module.
Be specific about the current scenario he is facing ,work
on configuration to give him best solution and be frank to
tell if config not possible.
thanks
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / himayath
Being a SAP Consultant we must understand the end user's requirements and their scenarios and explain them by Presenting the Business blue print how their scenarios have been mapped in SAP. After Go-live also we need to extend supportive hand whenever they need our presence. Our productive answers to their queries always build long time relation.
Is This Answer Correct ? | 0 Yes | 0 No |
What parameters you maintain in “plant parameters” in configuration?
What is process keys
what is backflush? what are the benefits of back flush?
How to insert an inspection checkpoint at the end of an operation?
Steps to configure Production order type.
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
Special Procurement type 40 – proc. form alt. plant
What are some important tables used in PP ?
what do you mean by planning time horizon
What is processing class, where we do them and why?
Mention how mrp (material requirement planning) types are classified?
what is varient BOM?