Answer Posted / tiruupathi rao
SPRO→IMG→ENTERPRISE STRUCTURE →DEFINITION→LOGISTICS GENERAL →DEFINE, COPY, DELETE, CHECK, PLANT.
Is This Answer Correct ? | 26 Yes | 1 No |
Post New Answer View All Answers
What is planning horizon?
What is the difference between the fixing type 1, 2, 3, 4?
How do you restrict the data to be entered in the payroll area?
What is the use of mrp list?
What are the t-codes for creating, changing and summarizing bom?
Can’t one material be assigned to more than one operation in a routine?
Explain the mrp list and their uses.
What is it 41 used for?
What does the use of ms70 followed by mcec get you?
How can you get planned orders scheduled so that you can do capacity leveling ?
Define mrp list
What is planning file entry
What are the production process in sap?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
what is alternative item group