how to convert udl into point load??
Answer / asif
by multiplying the uld with total span of the beam i.e for example udl is 2 kip/ ft & beam span is 30ft .then 2*30 =60 kips & it will act at centre i.e 15ft from both of the supports
Is This Answer Correct ? | 35 Yes | 3 No |
How can we make a hole in a solid rectangle using solidsworks?
How can we find out the clear cover for a circular ring and rectangular ring..
what is the full form of following sueface type of road - AC,CC,(PM,DM,SB),(CG,Ma,Me), G,E,O
1:5:10 isme 1 kya h 5 kya h 10 kya h
How much bricks, cement
what is the percentage of Fly Ash content in cement and in concrete?
How many bricks required for 1 cu.m
cement quantity in 1 M3 pcc
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
Instead of sand blasting is there any method to clean the rust of steel ???
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
48 Answers Alcove Infrastructure, Anantha Infra, L&T, Microqual, Shoba Devlopers, SSC, UltraTech, Valdan, VVA Developers,