How many cement & sand require in 300 sq ft plaster 8mm thickness
How calculate Load Bearing Capacity of Soil?
what is a minimum strength recommented for aerocon blocks?
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
types of laps in column
1.what is the main responsibilites of Site Engineer ? and what are main attitude ?
for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?
how many reputations of ply wood for concrete works can be used?
what is constat for brickwork
what is the quantity out-put by Hitachi-200 breaker for breaking or how to calculate
How to calculate Brick for 9"wall for100sqft
what we do if excavation is more than actual requirement
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)