As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
how to doing or how to prepare the or which things can be done on the site when construct the building?
what could be the production cost of 1 cum of concrete by CP30 plant
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
what is mean by centrifugal force which is act in vehicle on superelevation of road?
why demand factor less then 1 ?
What are the functions of a column in a building?
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
practically where this hinge and roller condition used
WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC
What are the alternate material for steel, Sand and aggregate
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)