Brick work how many days curing and at any concreting pl
Answers were Sorted based on User's Feedback
Answer / koshik
Brick work :-7to10 days
All concreting:-14to20days
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / abdul aziz
Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals
Is This Answer Correct ? | 0 Yes | 0 No |
what is 43 & 53 in cement
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
What is the effect of a building collapse?
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
say you are requsituoning cement to build masonry wall made of burnt clay bricks. how many 50 kgs cement bags will you requisition for 1:5 ratio mortar joint, if they masonry wall volume is 10 m3
how to find fineness modulus of sand?
What is the zero value in quantity surveying
what is thumb rule for calculating the size of ISMB required for a particular length of span
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
why building got air crack? if it get in one particular are what is means?
Significance/Uses/effect of Rolling Margin ?
what is the wait of cement in different concrete mixes from M15 TO M50