Please let me know DG set b check how many hour and days.

Answers were Sorted based on User's Feedback



Please let me know DG set b check how many hour and days...

Answer / suraj kumar

300 Hrs and 6 Months

Is This Answer Correct ?    5 Yes 0 No

Please let me know DG set b check how many hour and days...

Answer / hemanth kumar.b

300 HRS OR 6 Months which is earlier should do the b-check.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why burdens of VTs is more than CTs?

0 Answers  


why we use capacitor in Fans not resistor?

4 Answers   Vardhman,


how to select the rating of neutral ct with reference to transformer secondary current(in power transformer,stepdown tansformer,for example2000kva,11kv/415volt

2 Answers   ASD Lab,


Which fault is caused by lightening and thuderstorm a. Line to line fault b. Single line to ground fault c. Double line to ground fault

1 Answers  


why Ac current is alternating in nature?(or)why alternating current changes its direction?

3 Answers   APGenco,






why we ground the scondary of current transformer.

4 Answers  


Hi, I've just got into my electrical engineering course and I need some help with a question of mine here. During a site visit, we were shown a main LT panel which has switchgears, ammeters and different kinds of relays and the distribution network from that panel. In the main LT panel I've noted down the current readings as Ir - 163A, Iy - 150A and Ib - 147A. The Line to Line voltage is 415 V at 50 Hz and Line to Neutral voltage is 230V at 50 Hz. From the above details, how would I calculate the kVA rating of transformer? The primary side voltage of the transformer is 11 kV and the secondary side voltage is 415V and the frequency is 50 Hz.

2 Answers  


What is the reason behind 11kv 33kv 132kv.....means multiple of 11?

6 Answers  


what is active network?

2 Answers  


What is diference between ELCB & ELMCB?Also how its application for use in design area?

2 Answers  


Why do we have 110V, 230V, 415V etc. in electrical transmissions? Why not 100V, 200V,400V?

4 Answers  


why open-delta core of 11kv Potential Transformer is 11000v/1.732/110/3?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)