Please let me know DG set b check how many hour and days.
Answers were Sorted based on User's Feedback
Answer / hemanth kumar.b
300 HRS OR 6 Months which is earlier should do the b-check.
Is This Answer Correct ? | 3 Yes | 0 No |
why burdens of VTs is more than CTs?
why we use capacitor in Fans not resistor?
how to select the rating of neutral ct with reference to transformer secondary current(in power transformer,stepdown tansformer,for example2000kva,11kv/415volt
Which fault is caused by lightening and thuderstorm a. Line to line fault b. Single line to ground fault c. Double line to ground fault
why Ac current is alternating in nature?(or)why alternating current changes its direction?
why we ground the scondary of current transformer.
Hi, I've just got into my electrical engineering course and I need some help with a question of mine here. During a site visit, we were shown a main LT panel which has switchgears, ammeters and different kinds of relays and the distribution network from that panel. In the main LT panel I've noted down the current readings as Ir - 163A, Iy - 150A and Ib - 147A. The Line to Line voltage is 415 V at 50 Hz and Line to Neutral voltage is 230V at 50 Hz. From the above details, how would I calculate the kVA rating of transformer? The primary side voltage of the transformer is 11 kV and the secondary side voltage is 415V and the frequency is 50 Hz.
What is the reason behind 11kv 33kv 132kv.....means multiple of 11?
what is active network?
What is diference between ELCB & ELMCB?Also how its application for use in design area?
Why do we have 110V, 230V, 415V etc. in electrical transmissions? Why not 100V, 200V,400V?
why open-delta core of 11kv Potential Transformer is 11000v/1.732/110/3?