show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
No Answer is Posted For this Question
Be the First to Post Answer
What are the functions of a column in a building?
waht are pressure bulbs
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is the substitute of Mastic Asphalt?
shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
what happens when the curing is not done properly for structures ??
The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement