What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade.

Answers were Sorted based on User's Feedback



What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade...

Answer / pramod

67% as per 456

Is This Answer Correct ?    2 Yes 0 No

What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade...

Answer / sasank samantaray

14 Mpa as the strength should be 70% of 28 days strength.

Is This Answer Correct ?    1 Yes 1 No

What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade...

Answer / er.priya ranjan

13.5 N/mm2

Is This Answer Correct ?    1 Yes 1 No

What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade...

Answer / macksingh

45%-50%

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?

1 Answers  


In case if concrete box girder bridges how is the number of cells determined?

0 Answers  


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

0 Answers  


Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)

5 Answers   Clover, Rites,


What is the difference between engineering stress and true stress?

0 Answers  






How to design staircase.plz tell me formula for the design the staircase.

0 Answers   DMB Construction,


how much shuttering oil required for 100 sqm shuttering?

1 Answers   L&T, NCC,


What should be the Min.Penetration in a hard rock for all pile diameteres?

1 Answers  


How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.

0 Answers  


How many Sft of Level Plaster per Kg

0 Answers  


The relation between cube strength & cylinder strength because––

2 Answers  


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)