How to calculate quantity of binding wire for any kind of structures.
How to calculate quantity of nails in 1 sq m shuttering.
Answers were Sorted based on User's Feedback
Answer / farhat abbas naqvi
Binding wire calculation varies from 6kg to 9kg per ton average 7.5kg is taken for practical purpose.
Same way nails varies with the size of member.
Is This Answer Correct ? | 16 Yes | 2 No |
A ground is nonengginered fill 15 years back; how we can find the level of consolidation and bearing capacity
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
how much cft in 1 bag cement.
9 Answers Pinto Construction, Synergy,
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What is the use of extend command?
how to find quantity of concrete in PCC M15
whats is the Indian standard ratio for mix design M5 M10 M15 M20 M25 M30 M35 AND M40???
what is the difference between tsp & tower
What is the density of most of construction materials?
Difference between P.C.C and R.C.C?