L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
Is This Answer Correct ? | 8 Yes | 0 No |
explain the advantages of power factor correction is an RLC circuit for a commercial customer, include tarifs..
in rectifier circuit,we are using the capacitor as a filter to remove the ac signal.but capacitor blocks dc & allows only ac. explain about it?
how many types of storage classes in c and embedded c
whcih antenna is better ommi directional or directional and why?
If a square wave is integrated by integrator using op-amp, the output is A Triangular wave B Ramp C Sine Wave D None of these
Mention the protocols used in data transfer.
What frequency bands are used in satellite communication?
Why doping is done in semiconductors?
Explain half-duplex and full-duplex communication?
Which series of ICs are used for military applications?
why u choose ece
Once number portability is launched,how will call flow when B subscriber is in roaming?