comparision difference between GSB and WBM subbase in road
construction
Answer / manjit singh
GSB -Granular Sub Base
WBM - Water Bound Meccadum
| Is This Answer Correct ? | 3 Yes | 1 No |
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
what is the calculation of raw material for 0.35cum of m-15
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
0 Answers Ace Info, Anil Group,
what is the I.S. CODE of RCC
What is the difference between lap splice length and development length of rebars?
what is diffreant between the english bond&flamish bond
HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM
pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?
how to calculate total cost for slab 35'×8'
how much cement and sand required for 100sqm of wall plastering in different proportions
0 Answers Bharti, Pvr Constructions,
What is the specific weight of sand?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)