I NEED THE CABLE SIZE. I=800A AND P=315KW
Answers were Sorted based on User's Feedback
What precautions we have to take while handling electrical equipments?
sir, iam ramya.... from the discipline of E.E.E appearing for jindal exam .sir, could you please send me the modal papers of recent jindal steel exam.
what are factors to be consider to design a HT & LT motor?
what will happen when ac is applied resistor,inductor,capcitor?
when we start the tube light, then it takes initially 1100 volt, after glow it takes 120 volt?(when we give 220 volt a.c.)
I have seen 1 video in which a person getting shock while standing at top of a train,i have 1 question? why the people sitting in the train doesn't get shock while that man getting shock from top of the train? How the earthing of train works?
why dc supply is given to the field of alternator
How to test the thyresitor or SCR by multmeter?
What is the maximum and minimum rating of UPS?
how to syncronize two dg sets
How do you think they do earthing or grounding in ships and aeroplanes?
When One Phase PT Missing (voltage drop ) this time current is zero of This phase(PT Missing Phase) and current is Not Zero of other Phase but PF is always Low That Why