How to calculate the condensate values of boiler?
Answer / prathab
cement consumption in plastering work
Plastering work
cemnt sand Total
Mortar 1:6 = 1 6 7
Length = 1 m
Height = 1 m
thickness = 12 mm
Toal area = 1 sqm
Total volume = 0.012 cum
Volume of mortar = 0.001714286 cum
The voids of sand we nead 20% extra material = 0.002057143 cum
Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum
One bag cement = 0.0347 cum
2 Quantity of cement required = 0.071140387 Bag
= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148
| Is This Answer Correct ? | 0 Yes | 0 No |
relation between head,capacity & rpm
Explain proportional limit and elastic limit.
How to run AutoCAD lips? What is the uses of lips?
What are the things to do when approaching the port?
CAN ANY ONE TELL ME WHEN WILL CONDUCT ASSISTANT MOTOR VEHICLE INSPECTOR /RTO APPLICATIONS WILL RELEASE
Which elements increase the corrosion resistance of steel ?
ET-2012 questions published
How is natural gas better than lpg?
what are "R-condition"and "T-condition" in the designation of Steels ??
• What are the equipments that you would use inbetween when u have to connect a transformer to busbars?
any body know regarding team centre....
What is isometric drawing?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)