cement consumption in plastering work
Plastering work

cemnt sand Total
Mortar 1:6 = 1 6 7


Length = 1 m
Height = 1 m
thickness = 12 mm

Toal area = 1 sqm

Total volume = 0.012 cum

Volume of mortar = 0.001714286 cum


The voids of sand we nead 20% extra material = 0.002057143 cum

Now add 20% eetra to cover uneven surface of brick work = 0.002468571 cum

One bag cement = 0.0347 cum

2 Quantity of cement required = 0.071140387 Bag

= 3.55701935 kg SI.NO DESCRIPTION UNIT QUANTITY
1 CEMENT Kg 3.56
3 Quantity of sand required = 0.014811429 cum
2 SAND Cum 0.0148

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Mechanical Engineering Interview Questions

why does polytropic efficiency of a compressor decrease with increasing flow rate ?

0 Answers   L&T, ONGC,


what is tranformer and transducer

0 Answers  


hello sir iam atul joshi from mechanical branch. i want to know about the syllabus of technical ques of jindal steel

0 Answers   Jindal,


Explain why is thick steel wire stronger than thin steel wire?

1 Answers  


Is there a high demand for mechanical engineers right now?

0 Answers  






What is a combination thrust and radial bearing?

0 Answers  


Can you use motor oil in a hydraulic system?

0 Answers  


What are the causes of dirty lubricating oil?

0 Answers   RRB,


Explain why re-heater is used in gas turbine

0 Answers  


compare brayton and otto cycle

0 Answers  


interview questions asked in BHEL posteded in website

1 Answers   BARC, Bhel,


What is coefficient of performance?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)