How to calculate the number of reinforcing bars in a slab

Answers were Sorted based on User's Feedback



How to calculate the number of reinforcing bars in a slab..

Answer / lokhande suraj

{(( total length of slab )_( 2 x cover))/(spacing) } + 1

Is This Answer Correct ?    5 Yes 1 No

How to calculate the number of reinforcing bars in a slab..

Answer / santosh singh

All of the above answers are wrong


No of bars = long span /c to c spacing between rods 1

No of bars = short span /c to c spacing between rods 1

Is This Answer Correct ?    4 Yes 1 No

How to calculate the number of reinforcing bars in a slab..

Answer / feeb

which direction? if x,
(length)/(c/c spcing between two rods)

Is This Answer Correct ?    4 Yes 3 No

How to calculate the number of reinforcing bars in a slab..

Answer / surendra4577

Actually we not required calculate number of bars in a slab. We require only spacing of bars..
if we actually want to calculate number of bars..
Then
number of bars=(B/s)+1
B= length of slab
s= spacing of bars

Is This Answer Correct ?    1 Yes 1 No

How to calculate the number of reinforcing bars in a slab..

Answer / vittalanand

The question is how much steel is required. It is 0.089 % of volume of concrete.

Is This Answer Correct ?    0 Yes 0 No

How to calculate the number of reinforcing bars in a slab..

Answer / mohd saleem

total Lenght of slab-2*covver/space of bar

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

how many 10mm steel are needed in 99sqft room

2 Answers  


can you give me the details of rate analysis of steel and concrete?

0 Answers   L&T,


Exterior Joints,define

0 Answers   Saudi Oger,


Are you comfortable with formal design concepts in the home furnishings area?

1 Answers   ENI, L&T, SPML,


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

0 Answers  






A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


where is dolpin pile is used

3 Answers   IGCAR, Sekar Construction, Soba,


Whta is the proportion of M30

2 Answers  


How to calculate quantity of binding wire for any kind of structures. How to calculate quantity of nails in 1 sq m shuttering.

2 Answers   Vodafone,


How much cement is require in one sqft area in a G+3 residential construction.

0 Answers  


What is the l/d ratio of cantilever beam?

0 Answers  


what is project planning

2 Answers   NCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)