Answer / shakeel akhtar

35.314

Is This Answer Correct ?    19 Yes 4 No

1m3 of brick is equal to how many cft of brick ..

Answer / ambarish

Its 35.28 Cft.

Is This Answer Correct ?    8 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / er md sabbir

35.31 cft
because 1cum=35.31 cft

Is This Answer Correct ?    3 Yes 0 No

1m3 of brick is equal to how many cft of brick ..

Answer / parthapratimmid@yahoo.com

35.315

Is This Answer Correct ?    1 Yes 0 No

1m3 of brick is equal to how many cft of brick ..

Answer / deepchand

35.38

Is This Answer Correct ?    1 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / adnan

35.323

Is This Answer Correct ?    0 Yes 1 No

1m3 of brick is equal to how many cft of brick ..

Answer / guest

35.29 cft

Is This Answer Correct ?    0 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / jk

35.51 cft

Is This Answer Correct ?    2 Yes 7 No

1m3 of brick is equal to how many cft of brick ..

Answer / g.a.naidu

10.765 cft

Is This Answer Correct ?    1 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3

0 Answers   Ajnara Group, Assosa University,


what formula used to find the length of triangle ring in column?

1 Answers   Hitech,


how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.

3 Answers  


at what pressure ply-wood is obtained by gluing wooden sheets

0 Answers  


why does the most of civil engg is not intersted to going for teaching field?

0 Answers  






What are the effects of water on shear strength and foundations?

2 Answers  


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

0 Answers   bsmcpl, L&T,


shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above

1 Answers  


What does civil status mean?

0 Answers  


what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.

0 Answers   bscpl,


in how much square meter of slab we are providing a beam it may be oneway or twoway slab.

1 Answers  


what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :

6 Answers   Trident,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)