why top layer of block work shoud be full size if any cut
block adjustable than another layer?
No Answer is Posted For this Question
Be the First to Post Answer
How much material will consume for following specification water tank (9*7.5*6 feet)?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
what is the difference of 53 & 43 grade cement ? expailn
8 Answers Gujarat Alkalies and Chemicals GACL,
what is moment-curvature relationship in semi rigid connections??
How do you calculate load bearing capacity of a waffle slab?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
How to convert rainforcement calculation: Running meter to kg
23 Answers Interscape, Pratibha Industries,
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
What is full form of r.c.c?
What is the finess modulus of sand?
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)