meaning of two lines in between the transformer single line
diagram??

Answers were Sorted based on User's Feedback



meaning of two lines in between the transformer single line diagram??..

Answer / gopal

MEANING OF TWO LINE IN LINE REPRESANTATION OF TRANSFORMER IS
TRANSFORMER CORE ON WHICH WINDING IS DONE.

Is This Answer Correct ?    4 Yes 0 No

meaning of two lines in between the transformer single line diagram??..

Answer / p anbarasu

CORE

Is This Answer Correct ?    1 Yes 0 No

meaning of two lines in between the transformer single line diagram??..

Answer / aravind s

winding

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

What is ferro-resonance in electrical system? Why it occurs and what are measures to prevent it?

0 Answers  


If ROC does not lies inside unit circle,then ? a) Fourier transform converges b) Z transform converges c) Hatly transform converges d) Colpit Transform converges.

0 Answers   CCP,


In legging current reactive power is arise but in leading current which power will be arise ? and in this case, is active power more than rated ?

3 Answers  


xpression 'document.FrmQF.myemail' [

0 Answers   ABB,


How many no of flip-flops are required to get 16 bit counter

10 Answers   HAL,






When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?

0 Answers   HPCL,


Is RTCC panel needs any control supply.

0 Answers   HPCL, Schneider,


WHY 6.6KV MOTORS ARE STAR CONNECTED AND WHY NOT DELTA CONNECTED,

15 Answers   Bhel,


i need to connect fact device(any one from following upsc,sssc,svc,statcom and tcsc)in 14 bus system....by using MATLAB psat software....if i connect these fact devices,i will get some error as "virtual error"...i cnt rectify this error.if anybody know that how to work in psat,pls help me to rectify this error.... or send mail me to, viki0607@yahoo.co.in

1 Answers  


What is meant by rating error prevention in breaker??

1 Answers   L&T,


when we have to purchase the transformer by own i.e how much load will preferred HT connection?

0 Answers   Power Square,


why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving

0 Answers   HCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)